Work is getting done on the slab construction at Holden Court! Stop by and see the new construction.
Wednesday, December 11, 2013
Monday, December 2, 2013
Breaking Ground on Spec #2 and #3
Tuesday, November 12, 2013
5332 Stone Crest Drive - Price Reduced!
![]() |
Bathroom #2 |
![]() |
Living/Dining Room and Kitchen |
![]() |
Sheldon and Tera in front of the finished Spec Home |
![]() |
Custom Shower in Master Bathroom |
![]() |
Master Bathroom |
![]() |
Cedar Deck |
![]() |
Cedar Deck |
Contact Sheldon or Tera for more information and specifications on this house.
Sheldon - 620-640-1173
Tera - 620-353-4396
Thursday, October 17, 2013
Parade of Homes
Come out to the house anytime during the Flint Hills Area Builders Association Parade of Home. You can get an event book at Mead Lumber, or we'll have some out at the house so you can visit the other homes on the parade.
We are excited for you all to view our finished spec home. Hope to see you out there!
Sheldon and Tera
Thursday, October 17th 5-8 pm
Friday, October 18th 5-8 pm
Saturday, October 19th 10 am - 4 pm
Sunday, October 20th 1 pm - 4 pm
We are excited for you all to view our finished spec home. Hope to see you out there!
Sheldon and Tera
Monday, October 7, 2013
Flint Hills Area Builders Association Parade of Homes
Our house will be featured in the Parade of Homes put on by the Flint Hills Area Builders Association. We are very excited to show off the house for the parade on October 17th-20th.
We will post more information as it becomes available, but this is the link to the event flyer.
POH Flyer
Come on out if you are in the Manhattan area!!!
Sheldon and Tera
We will post more information as it becomes available, but this is the link to the event flyer.
POH Flyer
Come on out if you are in the Manhattan area!!!
Sheldon and Tera
Cabinets going in!
Master bathroom "His" vanity with Onyx top and sink. The tile is done in the shower and looks absolutely amazing. I have to get a better picture of it in daylight so you can appreciate the work!
This is the bathroom that is attached to the "kids" bedrooms. I am really happy with how the design turned out. There is a lot of storage in this house!
The Kitchen cabinets are being installed. This shows the crown molding that is going at the top of all of the cabinets.
Monday, September 30, 2013
Subscribe to:
Posts (Atom)